Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 12 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Wld Automatic Electrostatic Powder Coating Spraying Equipment/Machine/Painting Lines/Paint Spray Booth/Production Line for Automotive/Wheel/Metal/Aluminum Profile:
1. Powder spraying line: hanging → degreasing spray (50-60 ºC) → clean water spray (1 min) → clean water spray (1 min) → DI (swimming immersion for 1 min) → DI spray (1 min) → DI spray cleaning (1 min) → draining section → drying (120 ºC, 8 min) → cooling (18 min) → spraying (automatic, manual repair or manual spraying) → baking and curing (180-220 ºC adjustable, 28min) → Cool down (18min) → hang down.
5. Suspension conveying system:
5.1 The heavy-duty 200 suspension conveyor chain is used, and the single-point lifting weight is 50kg, including driving mechanism, heavy hammer tensioning device, chain, straight rail, curved rail, telescopic rail, bracket, primary spreader, electrical control system, overload automatic protection device, etc. .
5.2 Adopt the appropriate number of driving devices according to the tension of each line; no problems such as crawling and jamming.
5.3 The design process chain speed is: V=0.5m/min (0.5-1.0m/min steplessly adjustable).
5.4 The drive device adopts variable frequency stepless speed regulation technology.
5.5 Displacement limit protection switches are installed on the tensioning device, catenary emergency stop switches are installed in all key parts of th
e whole line, and the drive is equipped with mechanical and electrical double safety protection.
5.6 All tracks are equipped with turning light wheel slewing devices to reduce the driving load.
5.7 The track in the curing furnace is equipped with 2 expansion joints to ensure that the track has no thermal deformation.
5.8 The running noise of the drive chain is below 65db, and the grease-enclosed chain is used for easy maintenance.
5.9 The upward and downward slope angles of all conveyor chains are 30º;
5.10 Set the emergency stop button at each of the following positions, and set the acousto-optic display of the emergency stop position in the conspicuous position of the workshop to promptly inform the production management personnel of the emergency stop location:
The position of the upper part; the spray booth; the powder spraying room; the driving position; the control cabinet; the position of the lower part.
1.Verified more than 23 years original big factory,covers more than 15,000 square meters. We don't rent a workshop or factory to manufacture. We built the factory by ourself,so we never move to other places,then you can find us very easily at any time.
2. More than 23 years export trading business experiences with senior craftmans & technician who have been working here for years.
3. Quality first and service highest are the principle and belief in our WeiLongDa members.We are honest for any of our clients.
4. High quality raw materials,good facilities and skilled workers to make sure high quality products in the production. Quality control system is carried out in the whole production process. Please see below instruciton about the quality such as our paint booth.
5. Specially verified by famous Germany TUV Rheinland,more reliable. Please watch our TUV video and read TUV report to know more about us.
Q1:Are you Manufacturer or Trading Company?
A:We are a professional manufacturer with our own export department.
Our factory was established in 2000.
Q2:Where is your factory located? How can I visit there?
A:Our company is located in Guangzhou City, China.All clients, from home and abroad,are warmly welcomed to visit us.
Q3. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q4. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q5. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q6. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q7.Can we customize our product?
A:Yes,you can.Customized material and standard are acceptable. We can provide different standards according to your market and favor.
Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them.
Name: Mr Johnson 0086 139 22325158