| Customization: | Available |
|---|---|
| After-sales Service: | Online and Others |
| Warranty: | 12 Months |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Wld Painting Equipment Automotive Spray Paint Booth cabine de peinture car painting cabin Car Paint Booth painting booth auto paint oven bus spray booth CE
1. We are manufacturer with our own factory, built in 2000. We design and produce our own products.
2. Our factory established in 2000. Our factory location: NO.20-1, Xixiu Road, Xiuquan Street,Huadu District, Guangzhou,China,it's only about 30 mins away from Guangzhou Baiyun airport, Welcome to visit us.
3. We are one of the first and earliest spray booth manufacturers in China.Since 2000.
4. Our Service: Design,Produce, Loading, Installation Service If You Need.
5. Customized service, such as size, color, special requirement etc.
6. CE,ISO Certificate.
7. High quality with good price.
8. Large order can be placed.
9.We design and produce Powder Coating Line, Spray Booth, Prep Station, Mixing room,Water Curtain Boogth.
Please contact Grace Yu for more details.
Description:
12m, 15m, 18m, 20m, 30m...any sizes can be customized;
| Internal Size | 30x7x7 | |
| External Size | 31x10.3x7.7 | |
| Heating system | Natural gas(optional) | |
| Air Flow | 31000 x 8 | |
| Air Speed (m/s) | 0.3-0.5 | |
| Power (KW) | 107 | |
| Vehicle Suited | Bus&Truck | |
| Cabin System | Wallboard | Sandwich style EPS (epispastics polystyrene) 75mm thickness. Colorful steel skin boards 0.476mm thickness. Galvanized steel roof panel. |
| Door | Electrical front rolling doors. Size: 6000(w) x 7000(h). 6 pcs of emergency doors. |
|
| Heating System | 8 Sets | Each set consists of 1 unit Italy Riello FS20 diesel burner 20,0000Kcal/h. Total 8 units of burners,160,0000Kcal/h. The heat exchanger is made of 1.5mm thickness stainless steel which features more heat dissipating surface, better heat exchange and better burner efficiency. |
| Air Circulation System | Air Intake System (8 sets): | Each set consists of 2x5.5kw intake fan. Total 16 units of 5.5kw intake fan. BELIMO 20N electric damper. |
| Air Exhaust System (8 sets): | Each set consists of 1x7.5kw exhaust fan. Total 8 units of 7.5kw exhaust fan. Multi-layer fiberglass filter. Exhaust air from basement or two sides of wallboard. |
|
| Air Purification System | Dual filtering structure. The primary filter can capture granules larger than 10μm. Ceiling filter capture granules bigger than 5μm. The air cleanliness in the working environment can reaches 98%. |
|
| Lighting System | Ceiling light has 60units x 4pcs of 15w lamps. Side light has 46 units x 4pcs of 15w lamps. Total 424pcs of 15 W lamps. |
|

| Working table size (L×W): | L900×W900 |
| Longitudinal moving distance | Depends on the internal length of booth |
| Longitudinal moving speed | 8m/min |
| Vertical lifting height: | 500-3000mm |
| Vertical lifting speed | 5m/min |
| Lateral extending distance: | 800mm |
| Max. Loading: | 300kg |
| Power supply | 380V/50Hz/3Phase,220V/415/60Hz/50Hz etc can be customized |
| Total power | 1.5Kw+0.75Kw+0.37Kw |
| Noise | ≤70db |
Product Showroom
Meeting Room
Factory View




Q1:Are you Manufacturer or Trading Company?
A:We are a professional manufacturer with our own export department.
Our factory was established in 2000.
Q2:Where is your factory located? How can I visit there?
A:Our company is located in Guangzhou City, China.All clients, from home and abroad,are warmly welcomed to visit us.
Q3. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q4. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q5. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q6. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q7.Can we customize our product?
A:Yes,you can.Customized material and standard are acceptable. We can provide different standards according to your market and favor.
Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Please contact Grace Yu for more details.