| Customization: | Available |
|---|---|
| Certification: | CE |
| Coating Application: | Aerospace Industry, Automotive Industry, Construction Industry, Electronics Industry, Food Industry, Medical Industry, Renewable Energy Industry, Textile Industry |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WLD Powder Coating Line Electrostatic Powder Coating Line Powder Finishing Line Manual Powder Coating Line Automatic Powder Coating Line Surface Coating Line CE
| 1. We are manufacturer with our own factory, built in 2000. We design and produce our own products. 2. Our factory established in 2000. Our factory location: NO.20-1, Xixiu Road, Xiuquan Street,Huadu District, Guangzhou,China,it's only about 30 mins away from Guangzhou Baiyun airport, Welcome to visit us. 3. We are one of the first and earliest spray booth manufacturers in China.Since 2000. 4. Our Service: Design,Produce, Loading, Installation Service If You Need. 5. Customized service, such as size, color, special requirement etc. 6. CE,ISO Certificate. 7. High quality with good price. 8. Large order can be placed. 9.We design and produce Powder Coating Line, Spray Booth, Prep Station, Mixing room,Water Curtain Boogth. Please contact Grace Yu for more details. ![]() |
|
A Powder Coating Line is a complete production system used to apply a dry powder paint to metal components. A powder coating line typically includes pre-treatment, drying, powder application, curing, and cooling zones. Parts move through these stages on a conveyor system to ensure consistent coverage and curing. Powder coating lines are widely used in especially industrial applications due to their durability, efficiency, and eco-friendly operation.
|
Main Components of a Coating Line
| Pretreatment/Washing Tunnel | Cleans and prepares the surface (e.g., degreasing, phosphating). |
| Drying Oven | Removes moisture after washing. |
| Powder Coating Booth | Area for powder spraying , usually with recovery systems (cyclone or cartridge filters). |
| Curing Oven | It is a high-temperature industrial furnace that solidifies powder into a durable, adhesive coating. It activates after powder is applied electrostatically to a part's surface. |
| Conveyor System | Moves the parts. |
Classification of Powder Coating Lines
| 1. Level of Automation | |
Automatic Powder Coating Line![]() |
Equipped with automatic conveyor system,suitable for large quantities of workpiece. |
Manual Powder Coating Line ![]() |
Without automatic conveyor system,suitable for small quantities of workpiece . |
| 2. Conveying Method | |
Overhead Conveyor Line![]() |
Parts hang from an overhead conveyor that runs continuously, the most common type for large quantity production. |
Floor/Ground Track Line![]() |
Parts are placed on floor-mounted trolleys, suitbale for large or heavy workpieces . |
3.Different Heating System |
|
| Natural gas, Diesel, Electricity etc. | |
| 4. Powder Recovery Method | |
| Catridge Filter Recovery |
Powder is collected through cartridge filters, compact design, suitable for manual lines or small quantity. |
Cyclone+Cartridge Secondary Recovery![]() |
A cyclone separates most of the powder, with cartridges as secondary filtration, high recovery efficiency, standard for automatic lines. |
Summary: How to Choose Suitable Type of Powder Coating Line?
· Small quantity,limited budget → Manual line + cartridge recovery |
| · Large Quantity → Automatic line (reciprocator) + cyclone recovery + overhead conveyor |
· Large / heavy workpieces → Floor conveyor + manual or automatic spraying |

Showroom at Our Factory
WLD Meeting Room
WLD Factory View
WLD Exhibition



Q1:Are you Manufacturer or Trading Company?
A:We are a professional manufacturer with our own export department.
Our factory was established in 2000.
Q2:Where is your factory located? How can I visit there?
A: NO.20-1, Xixiu Road, Xiuquan Street,Huadu District, Guangzhou,China,it's only about 30 mins away from Guangzhou Baiyun airport, Welcome to visit us.
Q3. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q4. What is your terms of payment?
A: By T/T, 50% as deposit for production, and balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q5. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF.
Q6. How about your Production Time?
A: Generally, it takes about 30 to 60 working days after 50% deposit.
Q7.Can we customize our product?
A:Yes,you can.Customized material and standard are acceptable. We can provide different standards according to your market and favor.
Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.